“Events Hall in Los Santos de Maimona” building project. I carried out the project in a team with three other engineering students. Two of them were electronic, one mechanical and one electrical.
Each member of the group was assigned certain tasks. I was in charge of designing the heating and air conditioning installations, industrial refrigerators, elevator, accessibility, fire protection, Health and Safety and Environmental Impact studies as well as helping with the preliminary design. We used Revit and CypeCad as software tools.
This project is far from the electronic and automatic disciplines, however in the degree we were trained as industrial engineers so part of the subjects have been devoted to teach how to calculate and design facilities in the industrial field. This knowledge can be applied to this type of project.